Specifications for submarine cable and pipeline route investigation.
View/ Open
Average rating
votes
Date
2009Author
Lai, Xianghua
Zhang, Jibo
Pan, Guofu
Chen, Xiaoling
Fu, Xiaoming
Song, Sheng
Hu, Taojun
Li, Dong
Status
PublishedPages
45pp.
Metadata
Show full item recordAbstract
The purpose of construction of submarine scientific observation network in the East China Sea from the seabed to the sea surface, is to deeply understand the material exchange process and mechanism between the Yangtze River estuary and the East China Sea under the influence of human activities and its eco-environmental effects, and study the formation mechanism, biogeochemical process and its impact on the ecological environment of the hypoxia zone in the East China Sea. From May to August, 2018, submarine cable route survey for this project was carried out in the East China Sea. The survey vessel used is the M.V.Heke 2. Survey contents include Bathymetric and topographic survey, seabed conditions, shallow geology, soil physical and mechanical properties, corrosive environmental parameters, marine hydrographic and meteorological elements and so on. Equipment and sensors, such as side scan sonar, sub-bottom profiler, magnetometer, sampler and CPT were employed in this survey. This sur.....
Publisher
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of ChinaChina
Series;Nr
GB/T 17502-2009;Document Language
enSustainable Development Goals (SDG)
14.AMaturity Level
TRL 2 Technology concept and/or application formulatedBest Practice Type
Manual (Guide etc)Citation
Lai, X.; Zhang, J.; Pan, G.; Chen, X.; Fu, X.; Song, S.; Hu, T. and Li, D. (2009) Specifications for submarine cable and pipeline route investigation. China, General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, 45pp. (GB/T 17502-2009). DOI: http://dx.doi.org/10.25607/OBP-558Collections
The following license files are associated with this item: