Report on best practice in conducting operations and maintaining: D 4.4. (Version 1 - 27/02/2012).
View/ Open
Average rating
votes
Date
2012Author
Petihakis, G.
Sorensen, K.
Hernandez, C.
Testor, P.
Ntoumas, M.
Petersen, W.
Mader, J.
Mortier, L.
Status
PublishedPages
176pp.
Metadata
Show full item recordAbstract
Considering the importance of observing systems and the
substantial investment made until now, an important task of JERICO is
to describe best practices in all phases of the system (pre-deployment test, maintenance, calibration etc);
to adopt common methodologies and protocols and to move towards the
harmonisation of equipment which will help in reducing maintenance and calibration costs.
These efforts are described and analysed in depth in this deliverable......
Publisher
Ifremer for JERICO ProjectIssy-les-Moulineaux, France
Series;Nr
JERICO – WP4 - Del. 4.4 - 270212 - V 1;Document Language
enDOI Original
10.13155/49741Citation
Petihakis, G.; Sorensen, K.; Hernandez, C.; Testor, P.; Ntoumas, M.; Petersen, W.; Mader, J. and Mortier, L. (2012) Report on best practice in conducting operations and maintaining: D 4.4. (Version 1 - 27/02/2012). Issy-les-Moulineaux, France, Ifremer for JERICO Project, 176pp. DOI:10.13155/49741.Collections