Drifter deployment instructions: SVP and SVP-Barometer Drifters. [Version 8].
Average rating
votes
Date
2006Author
Dolk, Shaun
Status
PublishedPages
2pp.
Metadata
Show full item recordAbstract
Drifter deployment instructions: SVP and SVP-Barometer Drifters.
1) Before deployment, remove ONLY the plastic shrink-wrap.
2) DO NOT REMOVE the paper tape securing the drogue and/or tether. Likewise, DO NOT REMOVE
the cardboard surrounding the float
........
Publisher
Global Drifter Program, NOAA/AOML/PhODMiami, FLA
Document Language
enMaturity Level
TRL 8 Actual system completed and "mission qualified" through test and demonstration in an operational environment (ground or space)Best Practice Type
Standard Operating ProcedureCitation
Dolk, S. [2006] Drifter deployment instructions: SVP and SVP-Barometer. Miami, FLA, Global Drifter Program NOAA/AOML/PhOD Global Drifter Program, 2pp. DOI: http://dx.doi.org/10.25607/OBP-433Collections