dc.contributor.author | Bensi, Manuel | |
dc.contributor.author | Siena, Giuseppe | |
dc.date.accessioned | 2019-07-31T20:29:32Z | |
dc.date.available | 2019-07-31T20:29:32Z | |
dc.date.issued | 2015 | |
dc.identifier.citation | Bensi, M. and Siena, G. (2015) Best practices related to mooring set-up. Presented at: Workshop on training for less experienced users of hardware, 15th September 2015, Trieste, Italy. Trieste, Italy, OGS, Istituto Nazionale di Oceanografia e Geofisica Sperimentale, 70pp. DOI: http://dx.doi.org/10.25607/OBP-531 | en_US |
dc.identifier.uri | http://hdl.handle.net/11329/999 | |
dc.identifier.uri | http://dx.doi.org/10.25607/OBP-531 | |
dc.description.abstract | Approaching an oceanographic mooring Principles of “Best Practices” in all phases of the system (predeployment test, maintenance, calibration etc.) should be followed.
They cover the entire infrastructural chain of data acquisition from
sensor (performance, robustness, accuracy, etc.) to supporting
system (cabling, electric and electronic components, etc.). The
user needs to take into account:
• Scientific aim (geographic location, physical and
biogeochemical properties in the region, etc.)
• Mooring Design
• Chose of hardware
• Technical and scientific staff
• Logistics
• Costs
• Risks | en_US |
dc.language.iso | en | en_US |
dc.publisher | OGS: Istituto Nazionale di Oceanografia e Geofisica Sperimentale | en_US |
dc.subject.other | Fix03 | en_US |
dc.subject.other | Mooring lines | en_US |
dc.subject.other | Mooring deployment | en_US |
dc.title | Best practices related to mooring set-up. Presented at: Workshop on training for less experienced users of hardware 15th September 2015, Trieste, Italy. | en_US |
dc.type | Report | en_US |
dc.description.status | Published | en_US |
dc.format.pages | 70pp. | en_US |
dc.description.refereed | Refereed | en_US |
dc.publisher.place | Trieste, Italy | en_US |
dc.subject.parameterDiscipline | Parameter Discipline::Physical oceanography | en_US |
dc.description.currentstatus | Current | en_US |
dc.description.sdg | http://purl.unep.org/sdg/SDGIO_00000048 | en_US |
dc.description.maturitylevel | TRL 8 Actual system completed and "mission qualified" through test and demonstration in an operational environment (ground or space) | en_US |
dc.description.bptype | Best Practice | |
dc.description.bptype | Training and Educational Material | |
obps.contact.contactname | Manuel Bensi | |
obps.contact.contactemail | mbensi@ogs.trieste.it | |
obps.resourceurl.publisher | http://www.fixo3.eu/download/A%20Practical%20introduction%20to%20marine%20monitoring%20hardware%20and%20procedures%20-%20OGS%20-%202015/Best_practices_related-to-mooring-setup.pdf | en_US |